Kaloyan Kulev

Design Engineer

Heating, Ventilation and
Air Conditioning


Profile

Experienced design engineer in the field of Heating, Ventilation and Air Conditioning.

Focused on delivering quality work and exceptional customer service.

Skilled in creating detailed drawings and technical project specifications.

Hardworking and energetic.

A quick learner for any task delegated.

Licenses

Full Designer`s License Chamber of Engineers in the Investment Design, Sofia, Bulgaria

Contact

+359897806334 LinkedIn kulev@hvaclancer.com

Education


Sofia University “St. Kliment Ohridski”
2015 – 2017 > Master`s degree, Facilities, Planning and Management

Technical University of Sofia
2013 – 2015 > Master`s degree, Heating, Ventilation, Air Conditioning, and Refrigeration Engineering

Technical University of Sofia
2009 – 2013 > Bachelor`s degree, Heating, Ventilation, Air Conditioning, and Refrigeration Engineering

Experience


C&B ENERGY CONSULT LTD.
Heating, Ventilation and Air Conditioning Design Engineer

2013 –
Completed various phases of the design in over a hundred projects, both residential and industrial. Coordinated with all parties involved in order to meet requirements and deadlines.

Skills


Autodesk AutoCAD | Microsoft Office | Diverse Selection Software

Languages


Bulgarian | English


Projects


Timeline

2021

Restaurant and SPA – Assistant Engineer

  • Ventilation:
Flow – 15000 m3/h, based on boxed fans, kitchen units, and heat recovery air handling units.
  • Air conditioning:
Cooling load/Heating load – 90.00/100.00 kW, based on direct expansion systems (Split). View Drawing

2021

Kinder garden – Assistant Engineer

  • Heating:

Load – 30.00 kW, based on conventional radiators and petroleum boiler.

View Drawing

2021

School – Assistant Engineer

  • Heating:

Load – 340.00 kW, based on conventional radiators and gas boiler.

View Drawing

2021

Residential building – Chief Engineer

  • Air conditioning:

Cooling load/Heating load – 140.00/190.00 kW, based on direct expansion systems (Multi-split).

View Drawing

2021

Residential building – Chief Engineer

  • Heating:

Load – 120.00 kW, based on conventional radiators and a central building heating system.

View Drawing

2021

Winery – Chief Engineer

  • Air conditioning Administration:

Cooling load/Heating load – 90.00/100.00 kW, based on direct expansion systems (VRV/VRF).

  • Air conditioning Winery:

Cooling load/Heating load – 140.00/150.00 kW, based on fan coil units and air-cooled chiller.

  • Domestic hot water supply:

Load – 15.00 kW, based on a hybrid system of solar panels and air-cooled heat pump.

  • Ventilation:

Flow – 10000 m3/h, based on heat recovery air handling units.

View Drawing

2021

Restaurant and Lobby bar – Chief Engineer

  • Heating:

Load – 80.00 kW, based on floor heating.

  • Ventilation:

Flow – 25000 m3/h, based on boxed fans, kitchen units, and heat recovery air handling units.

View Drawing

2021

Fish hatchery – Chief Engineer

  • Heating:

Load – 200.00 kW, based on fan heaters and air-cooled chiller.

  • Ventilation:

Flow – 70000 m3/h, based on heat recovery air handling units.

View Drawing

2021

Akin plan for churches – Chief Engineer

  • Heating:

Load – 20.00 kW, based on floor heating, a hybrid system of solar panels and air-cooled heat pump, buffer tank, and accumulator
for storing redundant heat.

View Drawing

2021

Kinder garden – Chief Engineer

  • Heating:

Load – 220.00 kW, based on floor heating, conventional radiators and gas boiler.

  • Air conditioning:

Load – 100.00 kW, based on fan coil units and air-cooled chiller.

  • Ventilation of a pool:

Flow – 3000 m3/h, based on hybrid air handling unit.

View Drawing

2021

Dairy (Creamery) – Assistant Engineer:

  • Steam for technological purposes:

Load – 1000 kg/h (P – 0.1 MPa), gas steam generator.

  • Compressed air:

Load – 2500 l/min, based on an air compressor.

View Drawing

2021

Residential building – Chief Engineer

  • Natural gas supply:

Building gas line and gas supply for twenty-two gas boilers.

View Drawing

2021

Storage base – Chief Engineer

  • Ventilation:

Flow – 350000 m3/h, based on air handling units.

View Drawing

2021

Buildings complex – Chief Engineer

  • Natural gas supply:

Site gas supply for five buildings, buildings gas lines, and gas supply for gas boilers.

View Drawing

2021

Residential building – Chief Engineer

  • Natural gas supply:

Building gas line and gas supply for fifty-five gas boilers.

View Drawing

2021

Hotel – Chief Engineer

  • Natural gas supply:

Building gas line and gas supply for a gas boiler, based on refillable gas cylinder bottles.

View Drawing

2021

Manufacturing facility – Chief Engineer

  • Air conditioning:

Cooling load/Heating load – 400.00/600.00 kW, based on fan heaters and air-cooled natural gas heat pumps.

  • Ventilation:

Flow – 200000 m3/h, based on axial fans, duct fans, heat recovery air handling units, and cyclone extractors.

View Drawing